20200320_144548

We have a fully assembled outside of the building now and the inside is coming on amazingly we now have the first fix of plumbing and windows as well as a fully tiled roof which was extremely interesting to watch and we were very thankful that it was not a windy day. The majority of the scaffolding has now come down which was loud and slightly hair-raising watching the huge poles be dismantled. We have been reading lots of stories around building with ‘Benny the Barmy Builder’ being a particular favourite, but luckily Martin and his team are far from barmy. Next week we are looking forward to the stairs being installed and also the flooring being laid so please check in and see the second storey.